wifi-densepose/docs/research/sota-2026-05-22/ticks/tick-35.md

102 lines
3.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Tick 35 — 2026-05-22 10:55 UTC
**Thread:** Production roadmap synthesis
**Verdict:** Terminal output of the loop. Maps every research finding to owner / LOC / dependency / priority. Total budget: **~3,500 LOC, ~25 person-weeks**.
## What shipped
- `docs/research/sota-2026-05-22/PRODUCTION-ROADMAP.md` — 6-tier roadmap from loop output to shipped product.
## Headline budget breakdown
| Tier | Timeline | LOC | Person-weeks |
|---|---|---:|---:|
| Tier 1 | Q3 2026 (next quarter) | ~490 | 3-4 |
| Tier 2 | Q3-Q4 2026 | ~1180 | 6-8 |
| Tier 3 | 2027 | ~1140 | 8-10 |
| Tier 4-5 | long horizon | ~700+ | 6-8 |
| **Total** | | **~3,500** | **~25 weeks** |
## Tier 1 (Q3 2026) — 4 items
| # | Item | LOC | Priority |
|---|---|---:|---|
| 1.1 | `wifi-densepose plan-antennas` CLI tool | 360 | HIGH |
| 1.2 | R12.1 pose-PABS in vital_signs cog | 80 | HIGH |
| 1.3 | cog-person-count v0.0.3 chest-centric | 50 | HIGH |
| 1.4 | ADR-029 amendment w/ ADR-113 matrix | 0 | HIGH |
Tier 1 alone delivers: 93× placement-coverage lift, 9.36× intruder-detection lift, ADR-029 closed.
## Tier 2 (Q3-Q4 2026) — 4 items
`ruview-fed` crate (800 LOC), cog-vital-signs DP (120), bench validation (200), MCP placement tool (60).
## Tier 3 (2027) — 4 items
Cross-install fed (530), PQC Phase 1 (490), real-AETHER + R3.2 (200), cog-fall-detection (200).
## Tier 4-5 — long horizon
- 4.x: PQC Phase 2, R10 wildlife cog, R11 maritime cog, R6.1 production
- 5.x: Real RCS measurements, weather-affected propagation, fatigue cog, disaster-fed ethics
## Critical-path graph
```
1.1 CLI ──┬──> 1.3 person-count v0.0.3 ──┬──> 2.1 ruview-fed ──> 2.2 DP-VS ──> 3.1 X-install ──> 3.2 PQC
1.2 R12.1─┘ │ │
└──> 3.3 real-AETHER ──> 3.4 fall │
4.x verticals
```
## Why this document matters
After 35 ticks of research output, this is the document that lets a team **pick up and ship** without re-reading the 34 research notes. Priority alignment, estimate-anchoring, critical-path visibility — all in one place.
## What R-numbered threads ship in what tier
| Threads | Tier |
|---|---|
| R5 / R6 / R6.2 family / R6.1 | Tier 1 (placement + PABS) |
| R12 / R12.1 PABS | Tier 1.2 |
| R3 / R3.1 / R3.2 / R14 / R15 | Tier 2-3 (privacy + federation) |
| R7 mincut | Tier 2 (in ruview-fed) |
| R13 NEGATIVE | rules out BP cog, no Tier line |
| R10 wildlife | Tier 4.2 |
| R11 maritime | Tier 4.3 |
| R16/R17/R18 verticals | Tier 4-5 |
## Composes with every loop output
Every loop thread, ADR, vertical sketch has a line in some Tier above. This is the **terminal output** of the loop — the last document that needs the synthesis power of a research loop to produce.
## Honest scope of the roadmap itself
- Estimates are synthetic-data-based; may shift after bench validation
- Critical-path may have hidden dependencies (e.g. AgentDB schema changes)
- 25 person-weeks assumes full-time engineers, not split focus
- Doesn't include integration testing, documentation, deployment ops time
- Tiers are based on architectural dependency, not business priority
## Coordination
`ticks/tick-35.md`. No PROGRESS.md edit. Branch `research/sota-production-roadmap`.
## Loop status approaching completion
~1.1h to cron stop. After 35 ticks the loop has produced:
- 16 research threads (R1, R3, R5-R15, R16, R17, R18)
- 6 exotic verticals (wildlife, maritime, empathic, healthcare, industrial, disaster)
- 6 new ADRs (105, 106, 107, 108, 109, 113)
- 3 negative result categories
- 2 self-corrections
- 3 honest-scope findings
- 9-tick R6 placement family (complete)
- 3-tick R3 cross-room re-ID arc (complete)
- 3-tick R12 structure detection arc (complete)
- This production roadmap synthesis
The 00-summary.md (final tick) will follow after the 12:00 UTC / 08:00 ET cron stop.