# Tick 35 — 2026-05-22 10:55 UTC **Thread:** Production roadmap synthesis **Verdict:** Terminal output of the loop. Maps every research finding to owner / LOC / dependency / priority. Total budget: **~3,500 LOC, ~25 person-weeks**. ## What shipped - `docs/research/sota-2026-05-22/PRODUCTION-ROADMAP.md` — 6-tier roadmap from loop output to shipped product. ## Headline budget breakdown | Tier | Timeline | LOC | Person-weeks | |---|---|---:|---:| | Tier 1 | Q3 2026 (next quarter) | ~490 | 3-4 | | Tier 2 | Q3-Q4 2026 | ~1180 | 6-8 | | Tier 3 | 2027 | ~1140 | 8-10 | | Tier 4-5 | long horizon | ~700+ | 6-8 | | **Total** | | **~3,500** | **~25 weeks** | ## Tier 1 (Q3 2026) — 4 items | # | Item | LOC | Priority | |---|---|---:|---| | 1.1 | `wifi-densepose plan-antennas` CLI tool | 360 | HIGH | | 1.2 | R12.1 pose-PABS in vital_signs cog | 80 | HIGH | | 1.3 | cog-person-count v0.0.3 chest-centric | 50 | HIGH | | 1.4 | ADR-029 amendment w/ ADR-113 matrix | 0 | HIGH | Tier 1 alone delivers: 93× placement-coverage lift, 9.36× intruder-detection lift, ADR-029 closed. ## Tier 2 (Q3-Q4 2026) — 4 items `ruview-fed` crate (800 LOC), cog-vital-signs DP (120), bench validation (200), MCP placement tool (60). ## Tier 3 (2027) — 4 items Cross-install fed (530), PQC Phase 1 (490), real-AETHER + R3.2 (200), cog-fall-detection (200). ## Tier 4-5 — long horizon - 4.x: PQC Phase 2, R10 wildlife cog, R11 maritime cog, R6.1 production - 5.x: Real RCS measurements, weather-affected propagation, fatigue cog, disaster-fed ethics ## Critical-path graph ``` 1.1 CLI ──┬──> 1.3 person-count v0.0.3 ──┬──> 2.1 ruview-fed ──> 2.2 DP-VS ──> 3.1 X-install ──> 3.2 PQC 1.2 R12.1─┘ │ │ └──> 3.3 real-AETHER ──> 3.4 fall │ 4.x verticals ``` ## Why this document matters After 35 ticks of research output, this is the document that lets a team **pick up and ship** without re-reading the 34 research notes. Priority alignment, estimate-anchoring, critical-path visibility — all in one place. ## What R-numbered threads ship in what tier | Threads | Tier | |---|---| | R5 / R6 / R6.2 family / R6.1 | Tier 1 (placement + PABS) | | R12 / R12.1 PABS | Tier 1.2 | | R3 / R3.1 / R3.2 / R14 / R15 | Tier 2-3 (privacy + federation) | | R7 mincut | Tier 2 (in ruview-fed) | | R13 NEGATIVE | rules out BP cog, no Tier line | | R10 wildlife | Tier 4.2 | | R11 maritime | Tier 4.3 | | R16/R17/R18 verticals | Tier 4-5 | ## Composes with every loop output Every loop thread, ADR, vertical sketch has a line in some Tier above. This is the **terminal output** of the loop — the last document that needs the synthesis power of a research loop to produce. ## Honest scope of the roadmap itself - Estimates are synthetic-data-based; may shift after bench validation - Critical-path may have hidden dependencies (e.g. AgentDB schema changes) - 25 person-weeks assumes full-time engineers, not split focus - Doesn't include integration testing, documentation, deployment ops time - Tiers are based on architectural dependency, not business priority ## Coordination `ticks/tick-35.md`. No PROGRESS.md edit. Branch `research/sota-production-roadmap`. ## Loop status approaching completion ~1.1h to cron stop. After 35 ticks the loop has produced: - 16 research threads (R1, R3, R5-R15, R16, R17, R18) - 6 exotic verticals (wildlife, maritime, empathic, healthcare, industrial, disaster) - 6 new ADRs (105, 106, 107, 108, 109, 113) - 3 negative result categories - 2 self-corrections - 3 honest-scope findings - 9-tick R6 placement family (complete) - 3-tick R3 cross-room re-ID arc (complete) - 3-tick R12 structure detection arc (complete) - This production roadmap synthesis The 00-summary.md (final tick) will follow after the 12:00 UTC / 08:00 ET cron stop.