arsen e4204595b0 docs: actualization sweep — close items shipped this session
Cross-referenced every ADR Open Items section + both reference docs
against the actual implementation state on the branch. Closed items
the session shipped, kept stale "will be done in ADR-X" forward-refs
honest:

ADR-100    NBVI port (ADR-102), RSSI parse fix (3393c1e8), idle-
            channel keepalive (ADR-106).  Tailscale-target still open.
ADR-101    per-sub baseline-drop / off-axis sit (both via ADR-104).
             CV saturation above ~30 % still open.
ADR-102    Step 3 FP-rate validation (ADR-104 D4).
ADR-103    all three open items closed (REST endpoint via ADR-107,
            per-sub comparison via ADR-104, auto-recalibrate via ADR-107).
ADR-106    FW-side µs timestamp via OTA (b787f40a).

espectre-techniques.md:
- NBVI: now "DONE (all 4 NBVI steps)" instead of "missing Step 3".
- Persisted calibration: split into "server (ADR-103) + FW NVS (ADR-108)"
  with intentional design note for NBVI staying server-side.

espectre-gap-analysis.md:
- NBVI Step 3, gain-lock NVS, baseline persistence, threshold
  persistence all flipped to  in the per-section comparison tables.
- Priority list restructured into " Done in this session" (10 items)
  + " Still open by impact" (14 items) with reality-checked
  estimates. Top 3 open: HA via MQTT, 2 000-packet test suite,
  per-sub delta sparkline in raw.html.

Verbatim Pace Part-2 article still informs the gap structure; nothing
was removed from his pipeline, only RuView's column updated.
2026-05-17 13:52:50 +07:00
..
espectre-gap-analysis.md docs: actualization sweep — close items shipped this session 2026-05-17 13:52:50 +07:00
espectre-techniques.md docs: actualization sweep — close items shipped this session 2026-05-17 13:52:50 +07:00
ota-pipeline.md docs(refs): ota-pipeline.md — verbatim OTA reproduction recipe 2026-05-17 12:24:02 +07:00