The cir_pipeline end-to-end test was gated on the same dominant_tap_ratio floor; the windowed-ratio fix resolves it. All 6 ADR-134 P2 CIR tests (cir_synthetic 5 + cir_pipeline 1) now pass. signal+cir: 472 pass / 0 fail. Co-Authored-By: claude-flow <ruv@ruv.net> |
||
|---|---|---|
| .. | ||
| data | ||
| calibration_drift.rs | ||
| calibration_roundtrip.rs | ||
| calibration_synthetic.rs | ||
| cir_ghost_taps.rs | ||
| cir_pipeline.rs | ||
| cir_synthetic.rs | ||
| validation_test.rs | ||