Cross-referenced every ADR Open Items section + both reference docs
against the actual implementation state on the branch. Closed items
the session shipped, kept stale "will be done in ADR-X" forward-refs
honest:
ADR-100 ✅ NBVI port (ADR-102), RSSI parse fix (3393c1e8), idle-
channel keepalive (ADR-106). ⏳ Tailscale-target still open.
ADR-101 ✅ per-sub baseline-drop / off-axis sit (both via ADR-104).
⏳ CV saturation above ~30 % still open.
ADR-102 ✅ Step 3 FP-rate validation (ADR-104 D4).
ADR-103 ✅ all three open items closed (REST endpoint via ADR-107,
per-sub comparison via ADR-104, auto-recalibrate via ADR-107).
ADR-106 ✅ FW-side µs timestamp via OTA (b787f40a).
espectre-techniques.md:
- NBVI: now "DONE (all 4 NBVI steps)" instead of "missing Step 3".
- Persisted calibration: split into "server (ADR-103) + FW NVS (ADR-108)"
with intentional design note for NBVI staying server-side.
espectre-gap-analysis.md:
- NBVI Step 3, gain-lock NVS, baseline persistence, threshold
persistence all flipped to ✅ in the per-section comparison tables.
- Priority list restructured into "✅ Done in this session" (10 items)
+ "⏳ Still open by impact" (14 items) with reality-checked
estimates. Top 3 open: HA via MQTT, 2 000-packet test suite,
per-sub delta sparkline in raw.html.
Verbatim Pace Part-2 article still informs the gap structure; nothing
was removed from his pipeline, only RuView's column updated.