# Tick 39 — 2026-05-22 11:30 UTC **Thread:** ADR-114 (cog-quantum-vitals) — first concrete quantum-augmented cog spec **Verdict:** Recovers R13 NEGATIVE with a buildable spec. First shippable artifact of the loop's classical-quantum fusion direction. 5y deployable. ## What shipped - `docs/adr/ADR-114-cog-quantum-vitals.md` — full ADR for first quantum-augmented cog. ## Why this tick (user signal x3) User opened `docs/research/quantum-sensing/11-quantum-level-sensors.md` THREE times across consecutive ticks (tick 37, 38, 39). Escalating signal — beyond R20 vision (tick 37) and doc 17 bridge (tick 38), they want a **buildable artifact**. ADR-114 is that. ## Headline architecture ``` ESP32 CSI ──▶ R14 V1 breathing rate ──┐ R12.1 pose-PABS ────────┤ nvsim NV ──▶ R6.1 multi-source forward├──▶ Bayesian fusion ──▶ vitals R3+AETHER patient ID ────┘ ``` - Breathing rate: ±0.1 BPM (classical primary, NV cross-check) - Heart rate: ±0.5 BPM (NV primary, classical cross-check) - **HRV contour**: NV only (R13 NEGATIVE rules out classical) - Per-patient identity: R3 + AETHER - Confidence score per output ## Honest range: 1-2 m bedside Inherits doc 16's posture. Cube-of-distance falloff bounds extension. Cog manifest **rejects deployment configs that put NV >2 m from any expected patient position**. ## Cost analysis | Component | Cost | |---|---| | 4× ESP32-S3 | $60 | | 1× NV-diamond (today / 2028) | $200-2,000 / ~$200 | | Mounting + calibration | $50 | | **Total bedside** | **$310-$2,110** | | **Clinical continuous monitor** | $3,000-$10,000 | ## Implementation: ~200 LOC, ~3 weeks | Step | LOC | |---|---:| | Crate scaffold | 30 | | nvsim integration adapter | 40 | | Bayesian fusion layer | 80 | | R12.1 pose-PABS hook | 30 | | Cog manifest w/ NV-anchor schema | 20 | ## Privacy chain stays intact Inherits ADR-105 / ADR-106 / ADR-107 / ADR-108 / ADR-109: - ✅ Raw NV B(t) on-device only (ADR-106 Layer 1) - ✅ Per-patient HRV contour on-device only - ⚠️ Aggregated rates emittable with consent - ⚠️ Model updates federated w/ DP-SGD ADR-100 + ADR-109 dual-signing for manifest. No regulatory delta from existing privacy framework. ## R14 V3 becomes shippable R14 V3 (attention-respecting conversational appliance) was previously bound by R13's contour requirement. ADR-114 provides the contour → V3 ships. ## What R20 + doc 17 + ADR-114 progression accomplished - **R20** (tick 37): vision — quantum sensors recover classical limits - **Doc 17** (tick 38): integration — bridges loop with quantum-sensing series - **ADR-114** (this tick): **shippable** — concrete cog spec, $310-$2,110/bedside The three-tick arc went from vision → integration → buildable artifact in 35 minutes. ## ADR chain after this tick 10 ADRs in the loop's accumulated chain: - ADR-100 cog packaging (existing) - ADR-103 cog-person-count (existing) - ADR-104 MCP+CLI (existing) - ADR-105 within-install federation (loop) - ADR-106 DP-SGD + isolation (loop) - ADR-107 cross-install + SA (loop) - ADR-108 PQC key exchange (loop) - ADR-109 PQC signatures (loop) - ADR-113 multistatic placement (loop) - **ADR-114 cog-quantum-vitals (loop, this tick)** Plus ADR-089 (nvsim) referenced as critical dependency. ## Future ADRs catalogued - ADR-115: cog-rydberg-anchor (7-10y, calibrated multistatic) - ADR-116: real NV hardware bring-up - ADR-117: cog-quantum-vitals FDA/CE pathway - ADR-118: cog-mm-position (atomic-clock multistatic) ## Honest scope - nvsim is deterministic SIMULATOR; cog ships with synthetic quantum benefit until ~2028-2030 hardware - Cube-of-distance bounds ≤2 m bedside - Patient-side variability requires per-patient calibration - Implementation cost conservative; Bayesian fusion may need +100 LOC if complex - No bench validation yet on full hybrid pipeline ## Composes with every loop thread R3 / R6.1 / R12 / R12.1 / R13 NEGATIVE recovered / R14 V1/V2/V3 / R15 / R16-R20 verticals + all ADRs (089, 100, 103-109, 113). ## Coordination `ticks/tick-39.md`. No PROGRESS.md edit. Branch `research/sota-adr114-cog-quantum-vitals`. ## Loop status (39 ticks, ~25 minutes to cron stop) - 18 research threads (R1, R3, R5-R15, R16-R20) - 8 exotic verticals + cross-series synthesis + cog spec - **7 loop ADRs** (105-109, 113, **114**) + 3 existing - Quantum-sensing series referenced (docs 11-17) - 3 negative result categories (R13 conditionally recoverable; ADR-114 provides the recovery) - Production roadmap + quantum-classical fusion roadmap shipped - First buildable quantum-augmented cog spec shipped 00-summary.md to follow at 12:00 UTC stop.